Civil Projects
- 2018-Current
- HONG KONG HANG TONG CO., LTD.Hong Kong International Airport Three Runway Project C3206
- PORT WORKS
Sloping seawall & vertical seawall construction
- 2018-Current
- BUILD KING-SCT JOINT VENTURECivil Eng. and Development Department NL/2017/03
Tung Chung New Town Extension Reclamation and Advance Works - PORT WORKS
Sand Reclamation / Geotextile / Silt Curtain / Perimeter Mould
- 2018-Current
- BACHY SOLETANCHE GROUP LTD.Hong Kong International Airport 3503 - Terminal 2
Foundation and Substructure Works - SITE FORMATION
Construction of Concrete Slab
Diaphragm Wall and Guide Wall Construction
Soil Disposal
- 2018-2019
- MTR CORPORATION LIMITEDExpress Rail Link Contract 8209
- SITE FORMATION
Design and construction of Nam Cheong Park Reinstatement
- ROAD & DRAINAGE
Design and construction of Nam Cheong Park Reinstatement
- 2017-Current
- LEIGHTON-CHINA STATE JVMTR Corporation Ltd. SCL1123
Exhibition Station and Western Approach Tunnel - PORT WORKS
Receiving, Sorting, Handling, Loading for Marine Disposal of C&D Materials to the Legal Receipting Sites
- 2017-Current
- CHINA HARBOUR-ZHEN HUA JVCivil Eng. and Development Department CV/2015/07
Handling of Surplus Public Fill (2016-2018) - PORT WORKS
Collection and Delivery of Public Fill Between Public Fill Reception Facilities
- 2017-2017
- BACHY SOLETANCHE-SAMBO JVHong Kong International Airport C3205
- PORT WORKS
Installation of Silt Curtain and Barge Modification
- 2016-2018
- VINCI CONSTRUCTION GRANDS PROJETSMTR Corporation Ltd. SCL1122
Admiralty South Overrun Tunnel - SITE FORMATION
Mucking Out Subcontract
- 2016-2018
- MTR CORPORATION LIMITEDMTR Corporation Ltd. XRL8217
Shek Yam - BUILDING
Construction of U-channel and catchpit
- SITE FORMATION
Backfilling of Shek Yam Construction Adit
Reinstatement Work
Reinstate the existing stone wall
Hydroseeding work
- 2015-2016
- VINCI CONSTRUCTION GRANDS PROJETS3/F, 8/F and 11/F of Shui On Centre, Wanchai
- BUILDING
Fitting Out Works for Project Site Offices at 3/F., 8/F and 11/F of Shui On Centre
- 2015-2016
- PENTA-OCEAN-CHINA STATE JVC1121 NSL Cross Harbour Tunnels
- PORT WORKS
Crane Barge for lifting materials under HUH bypass
- 2015-2015
- KAU SAI CHAU PUBLIC GOLF COURSEKau Sai Chau
Sai Kung - ROAD & DRAINAGE
Replacement of Storm Water Drainage Pipe
- 2014-Current
- DRAGAGES-BOUYGUES JVMTR Corporation Ltd. SCL1128
South Ventilation Building to Admiralty Tunnels - SITE FORMATION
Excavation and Lateral Support for W1 Advanced Shaft
Construction of Concrete Slab and Reinstatement Works at Wan Chai Sports Ground
Noise Cover and Enclosure at Works Area W1 Advanced Shaft
Excavation of FPP Peanut Shaft at Works Area W8
Disposal of Spoil Excavated from TBM Tunnels
Excavation of SOV Shaft at Works Area W2
Demolition of Perimeter Wall at Works Area W14
Earthwork and R.C. Works at FPP Area 2 Shaft at Works Area W8
Demolition of Slurry Treatment Plant (Reinforced Concrete Structure)
Disposal of Precast Concrete Segments from Works area W21 to Tuen Mun River Trade Terminal
Disposal of the Demolished Temporary Concrete Structures in East Tunnels at Works Area W1/W2
Removal of Concrete Slab for POC’s Pre-Bored H-Piles Construction at Works Area W2
Construction of Fenwick Pier Emergency Egress Point and Cut & Cover Tunnel at Works Area W8
Demolition of Slurry Treatment Plant (Reinforced Concrete Structure) Works Area W14 - BUILDING
Renovation of Joint Site Accormodation at 3/F., 5/F., 10/F., 11/F & 31/F of Shui On Centre, Wanchai
Construction of Temporary Store Room & Water Pump Room at Wan Chai Sport Ground
Wire Cut to R.C. Middle Wall of FPP Structure at Works Area W8
Relocation of Memorial Statues & Historical Items for Trophies and Fitting Out Works at PSRC - ROAD & DRAINAGE
Temporary Road Construction at Lung King Street (Works Area W14)
Excavation Works for Expose Existing Underground Utilties at Works Area W8
Supply and Installation of Steel Pipe to the Outlet of Seawall at Works Area W1 - PORT WORKS
Supply, Fabrication and Installation of Silt Curtain at Works Area W1
Removal of Reclamation at Works Area W1
- 2014-Current
- DRAGAGES HONG KONG LTD.Civil Eng. and Development Department CV/2012/08
Liantang / Heung Yuen Wai Boundary Control Point
Site Formation and Infrastructure Works - Contract 2 - ROAD & DRAINAGE
Roadworks and Drainage Works at North Portal
- SITE FORMATION
Earthwork at North Portal
Site Formation, Slope and Drainage Works at Mid Ventilation Adit Portal
Platform Formation for Bridge Construction at South Portal
Sedimentation Tank at Mid Ventilation Portal
Disposal of Excavated Material from Adit at Mid Ventilation Portal
Site Formation, Slope and Drainage Works at South Portal
ELS at Spoil Basin at North Portal
Disposal of Excavated Material from Tunnels at North Portal
Disposal of Excavation Materials from Drill and Blast Tunnel at South Portal
Earthwork for Administration Building
Additional Works for Spoil Basin ELS
Earthwork for Administration Building Foundation
Shotcreting works for TBM Tunnels
Material Handling for TBM Tunnels
Permanent Soil Nailing Works at North Portal
- 2014-2018
- DRAGAGES-BOUYGUES JVHighways Department HY/2012/08
Tuen Mun Chek Lap Kok Link-Northern Connection Sub-Sea Tunnel Section - ROAD & DRAINAGE
Supply of Used Steel Ramp, Modification, Delivery and Installation of Used Steel Ramp for Barging Point
- PORT WORKS
Supply and Delivery of Rockfill Material by Marine to Tuen Mun
Marine Plant for Setup of South Ventilation Shaft
- 2014-2017
- OPERATION DAWN LIMITEDDawn Island
Sai Kung - ROAD & DRAINAGE
Substructure work, superstructure work, plumbing and drainage works
- 2013-2018
- VINCI CONSTRUCTION GRANDS PROJETSMTR Corporation Ltd. SCL1103
Hin Keng to Diamond Hill Tunnels - ROAD & DRAINAGE
Concreting Package at Diamond Hill Site
Construction of TBM Unloading Bay and storage area at Kai Tak
Road Widening in Hin Keng Site - SITE FORMATION
Construction for MCV Temporary Platform
Construction for FTA Temporary Platform
Mucking Outs Works
Excavation at Mucking Out at Portal at Hin Keng
Hin Keng Box 2 Excavation
Shaft Excavation at Diamond Hill Site
To supply and install Cut-off Wall Capping Beam at Diamond Hill Station
DIH Capping Beam Remaining D-wall Panels
Construction of Base Slab at Diamond Hill Station
Rock Filling and Concrete Slab at Shui Chuen O
Shaft & Central Accomodation Excavation & ELS Works at Ma Chai Hang
Excavation of Cut and Cover Tunnel Area 3 at Hin Keng
Site Clearance of TKO Magazine
Concrete Structure Breaking and Excavation for DIH Site Area
Demolition and Removal of 3rd Filter Structure at DIH site
Reinstatement Works at Hin Keng and W5B - BUILDING
King Post Fire Protecion Concrete Trimming Works
Supply & installation of Bus Shelter at MCV
- 2013-2014
- THE HONG KONG JOCKEY CLUBSai Kung Resort House
- ROAD & DRAINAGE
Slope Undating work at Sai Kung Resort House
- 2013-2013
- CHINA HARBOUR ENG. CO. LTD.Hong Kong International Airport P547
Midfield Parking Stands - PORT WORKS
Earthwork – Disposal of Materials by Marine Transport
- 2012-2016
- DRAGAGES-CHINA HABROUR-VSL JVHighways Department HY/2011/09
Hong Kong-Zhuhai-Macau Bridge Hong Kong Link Road Section between HKSAR Boundary and Scenic Hill - PORT WORKS
Marine Deposit Disposal
Pile Cap Construction Works for Marine Viaduct Package A
Construction of In-situ Columns for Marine Viaduct
Construction of In-situ Columns at Pier P0 for Marine Viaduct
Construction of Turnaround Facility In-situ Column for Marine Duct
- 2012-2015
- NISHIMATSU CONSTRUCTION CO., LTD.MTR Corporation Ltd. SIL902
Nam Fung Tunnel and Ventilation Buildings - PORT WORKS
Reinstatement for Telegraph Bay Works Area
- SITE FORMATION
Land & Marine Disposal and Barging Point Operation
- 2012-2014
- LEIGHTON-GAMMON JVMTR Corporation Ltd. XRL810A
West Kowloon Terminus Station North - SITE FORMATION
Sorting and Disposal of Excavated Rock Material to XRL821
- 2012-2013
- LEIGHTON CONTRACTORS (ASIA) LTD.MTR Corporation Ltd. XRL822
Tse Uk Tsuen to Shek Yam Tunnels - SITE FORMATION
Tunnel Spoil Disposal
- 2012-2013
- BACHY SOLETANCHE GROUP LTD.CB204
Proposed Goldin Financial Global Centre at NKIL 6314 Kln. - SITE FORMATION
Spoil Removal for Diaphragm Wall, Bored Piles and Socketed H-Piles
- 2011-2018
- LAING O'ROURKE-HSIN CHONG-PAUL Y JVMTR Corporation Ltd. XRL810B
West Kowloon Terminus Station - ROAD & DRAINAGE
U-Channel, Concrete Pavement and Fencing Works
Construction of new road - SITE FORMATION
Basement Ventilation for top down construction
Supply and Installation of General Fill and Sub-base Material to Ground Floor Slab
Barging Point Reinstatement Works - PORT WORKS
Barge Management & Disposal to Mainland China
ELS at Sea Water Intake and Outfall Culvert
Sea Wall Modification Works
Sea Wall Break Through & Modification at SWIC
- 2011-2013
- BACHY SOLETANCHE GROUP LTD.Highways Department HY/2009/15
Central Wanchai Bypass Tunnel - PORT WORKS
Diaphragm wall & barrette construction and marine disposal to TM38
- 2011-2011
- BACHY SOLETANCHE GROUP LTD.Drainage Services Department DC/2007/24
Harbour Treatment Scheme
- SITE FORMATION
Shear pins construction at Sai Ying Pun
- 2010-2017
- GAMMON-LEIGHTON JVMTR Corporation Ltd. XRL811B
West Kowloon Terminus Approach Tunnel (South) - PORT WORKS
Barging Facilities at Nam Cheong Guay
Operation of Barging Facility and transportation to Mainland China
Initial hoarding barging facility at Nam Cheong Guay
Disposal of Fill Material
- 2010-2016
- DRAGAGES-BOUYGUES JVMTR Corporation Ltd. XRL820
Mei Lai Road to Hoi Ting Road Tunnels - BUILDING
Construction of Slab Foundation for Bentomix Building, Bentonite Silos, Storage Building and Converyor at Nam Cheong Barging Point
Placing of in-situ concrete for cut & cover Tunnels and VB7 - ROAD & DRAINAGE
Construction of Slurry Trench for Slurry Pipe
Construction of Stacker Retaining Wall & Footing, Stacker Dewatering Pit and Rotating Stacker
Water Pipe trench at Barging Point
Construction of Cut & Cover Tunnels at Hoi Ting Road Retrieval Shaft - SITE FORMATION
Construction of Sheet Piling Wall for DSD Rising Main Diversion
Construction of Socketed H-Pile
Foundation for DSD Rising Main Diversion
Construction of Temporary Fill Platform at Nam Cheong Launching Shaft
Site Establishment Works at Nam Cheong Barging Point
Construction of Concrete Slab inside Slurry Treatment Tanks
Construction of Slurry Tank Foundation Slab
Construction of Filter Press Slab for Slurry treatment plant
Additional Works for Backfilling of Retrieval Shaft 811A
Dismantling & Removal of Container Surrounding Site 6 Stockpile
Miscellaneous Works for Rockfill Layer at Nam Cheong Launching Shaft - PORT WORKS
Disposal of Spoil Excavated from TBM Tunnels to China by Marine
Land Transportation and Marine Disposal of Rock from Main Tunnel
Supply and Delivery of Sands for Mortar Production
Seabed Level Adjustment along the Seawall Adjacent to 820 Cheung Sha Wan Barging Point
- 2010-2015
- DRAGAGES-BOUYGUES JVMTR Corporation Ltd. XRL821
Shek Yam to Mei Lai Road Tunnels - ROAD & DRAINAGE
External Works for VB6 at Kwai Chung Site Area
Construction of CLP Cover - SITE FORMATION
Land Transportation of De-sanding Materials
Earthwork, Concrete Work and Miscellaneous
Breaking out of Concrete Invert Slab inside Tunnel Work for VB6
Closure of openings in 821 Twin Track Tunnel
Remedial works inside the Tunnels due to setting out errors
Backfilling to North & South Adit Bypasses - BUILDING
Addition and Omission Works
- PORT WORKS
Disposal of Tunnel Spoil to Mainland China by Marine
Site Establishment Works
- 2010-2013
- BACHY SOLETANCHE-LAING O'ROURKE JVMTR Corporation Ltd. XRL811A
West Kowloon Terminus Approach Tunnel - SITE FORMATION
Site Clearance and Construction of Temporary Carriageway and
Spoil Disposal for Piled Foundations Excavation & Lateral Support (ELS)
- 2010-2011
- BACHY SOLETANCHE GROUP LTD.MTR Corporation Ltd. XRL825
Mai Po to Ngau Tam Mei Tunnels - SITE FORMATION
Spoil Removal, Guide Walls
- 2010-2011
- BACHY SOLETANCHE GROUP LTD.MTR Corporation Ltd. XRL803A
West Kowloon Terminus Diaphgram Walls (Site A) - ROAD & DRAINAGE
Road & Drainage Works
- 2009-2010
- BACHY SOLETANCHE GROUP LTD.Proposed Development at TPTL No.188 Pak Shek Kok, Tai Po
- SITE FORMATION
Guide Wall and Spoil disposal
- 2008-2013
- DRAGAGES-NISHIMATSU JVDrainage Services Department DC/2007/10
Design and Construction of Hong Kong West Drainage Tunnel - BUILDING
Steel Fixing Works – Land transportation for dropshaft precast rings
- SITE FORMATION
Earthworks and Reinforced Concrete Works of Spoil Bsin at Western Portal
Excavated Materials Off Site from Western Portal
Supply of Pea Gravel to Western Portal
Site Set Up, Temporary Drainage Works, Shaft Intake & Slope works at Intake TP4, TP5, TP789
Temporary excavation and lateral supporting for deep structures
Removal of Pipe Pipes - ROAD & DRAINAGE
Installation of 610 dia. Marine pipe pile and reclamation work
Cable Trench Path at Site Entrance - PORT WORKS
Carrying out Temporary Marine Works at Western Portal including construction of seawall block
Marine Transportation of Surplus to Mainland China
- 2008-2009
- BACHY SOLETANCHE GROUP LTD.Contract for Foundation Works
Cathay Pacific Air Cargo - SITE FORMATION
Shoring installation
Spoil removal, pile head trimming & sheet pile
- 2006-2006
- LINK 200 JVContract No. KDB200
Kowloon Southern Link - BUILDING
Miscellaneous Works for Bored Tunnel Site Set Up
CLP Switch Room Building Construction
- 2005-2006
- BACHY SOLETANCHE GROUP LTD.Contract No. C407D
Tung Chung Station Development
Package 2, Phase 4 Lowrise Development - SITE FORMATION
Removal of Spoil & Construction of Guide Wall
Installation of sheet piling work
Construction of foundation work.
- 2004-2005
- WATER SUPPLIES DEPT. HKSARContract No. 3/WSD/03
Tin Hau Temple Road, North Point, H.K. - ROAD & DRAINAGE
Reprovisioning of North Point Salt Water Service
Reservoir and Relocation of North Point
Upper Salt Water Pump Station
- 2004-2005
- WATER SUPPLIES DEPT. HKSARContract No. 17/WSD/02
Village Mains in North District
Tai Po Stage 1, Phase 1 - ROAD & DRAINAGE
Replacement and Rehabilitation of Water Mains
- 2004-2005
- BALFOUR BEATTY GROUP LTD.Contract No. P 356
Skyplaza Limousine Lounge Work - BUILDING
Construction of Skyplaza Limousine Lounge
- 2004-2005
- BACHY SOLETANCHE GROUP LTD.Contract P352
Skyplaza Advance Works - SITE FORMATION
Construction of Guide Wall and Removal of Rock Fill
- 2004-2004
- EMSDCE/2003(TT)
Replacement of Traffic Control and surveillance System (TCSS)
Replacement of Traffic Control
and Surveillance System (TCSS) - ROAD & DRAINAGE
Cable and Ductworks Investigation
- 2003-2007
- BALFOUR-BEATTY LAM JVKRCR Contract No. LCC 300
Lok Ma Chau Terminus - ROAD & DRAINAGE
Construction of 3 km road and drainage work from
Castle Peak Road to Lok Ma Chau Terminal
- 2003-2006
- VSL HONG KONG LTD.Contract No. HY/99/19
Castle Peak Road - SITE FORMATION
Castle Peak Road Improvement
Construction of Reinforced Earth Wall
- 2003-2004
- BACHY SOLETANCHE GROUP LTD.Contract CA211
Shek Lei Estate Phase 10 - SITE FORMATION
Foundation Works for Block No.11 & 12 and Car Park
for Redevelopment of Shek Lei Estate Phase 10
- 2002-2004
- DRAINAGE SERVICES DEPT. HKSARWSD 17/WSD/01
Remedial Works to Chai Wan Reservoir - ROAD & DRAINAGE
Remedial Works to Existing Reservoir include
Re-Waterproofing & RC Inner Tanking
- 2002-2004
- CHINA STATE CONSTRUCTIONCED CV/2001/10 Contract 2 for
Infrastructures at Penny’s Bay Development - SITE FORMATION
Earthwork (Slope & Ground Treatment)
- 2002-2003
- DRAINAGE SERVICES DEPT. HKSARWSD 13/WSD/01
Ngau Tam Mei Treatment Works :
Mainlaying Along Castle Peak Road - ROAD & DRAINAGE
Mainlaying of 350m 1000mm dia Steel Water Main
- 2002-2003
- BALFOUR BEATTY GROUP LTD.CLKAA C312
Airport Extension at East Hall - ROAD & DRAINAGE
Construction of Substructure and Superstructure
Works including Road and Drainage Works
- 2002-2002
- CHINA STATE CONSTRUCTION ENG. CO.CEDD CV/2000/09
Infrastructures at Penny’s Bay - ROAD & DRAINAGE
Construction of Box Culvert (Start-up Package)
- 2001-2003
- DRAINAGE SERVICES DEPT. HKSARDSD DC/2000/05
Construction of Sewers at Tong Yan
San Tsuen, Yuen Long - ROAD & DRAINAGE
Construction of Drainage System
- 2001-2002
- WATER SUPPLIES HKSARWSD 12/WSD/00 Extension of Lime Store
at Sheung Shui Treatment Works - BUILDING
Construction of Superstructure Works
- 2001-2002
- AGRICULTURE, FISHERIES & CONSERVATION DEPT. HKSARR3/01-02
- ROAD & DRAINAGE
Construction of Footpath
- 2000-2002
- HKC-AMEC JVTDD TM/87/98 Wong Chu Road &
Interchanges Construction - ROAD & DRAINAGE
Earthwork RC Structures Road Improvement
Noise Mitigation and Drainage Works
- 2000-2001
- HAM-HKC JVCEDD CV/99/12
Penny’s Bay Reclamation Stage I - ROAD & DRAINAGE
Road and Drainage Slope Stabilization and Reinforced
Earth Structure Works
- 2000-2001
- BARCLAY MOWLEM-ZEN PACIFIC-CC JVMTRC TKO606 Tseung Kwan O Depot
- BUILDING
Locomotive Shed & Associated Works
- 1999-2003
- HKC-AMEC JV, KCRCKCRC CC212 & 213
Siu Hong & Tuen Mun Stations
West Rails Development - ROAD & DRAINAGE
Site Establishment Works Nullah Cofferdam
RC Substructures Box Tunnel
Retaining Wall and Footbridge Construction
- 1999-2002
- HONG KONG CONSTRUCTIONHYD HY/98/02
Tolo Highway Widening - ROAD & DRAINAGE
Roadwork, Retaining Walls, North Access Bridge,
Pak Shek Bridge Exten, Tai Po Kau Bridge Exten,
Tai Po Kau Underpass Exten
- 1999-2001
- AMECMTRC TKO605 Tseung Kwan O Depot
TKO Railway - BUILDING
Concrete Building Structures & Associated Works
- 1999-2000
- HYUNDAI E&C, SINO PROPERTIESOlympic Station Development
Site B Phase I & III - ROAD & DRAINAGE
Construction of 4 50-storey High-rise Residential
Towers on Residential Towers on a 4-storey Podium
and External Works and Road Works
- 1998-1999
- KUMAGAI GUMIDiscovery Bay North Development
- SITE FORMATION
Tunnel Excavation Works and pipe piling work
- 1998-1999
- AMEC-HKC JVDragonair & CNAC
Headquarter Development - BUILDING
Construction of 2 Office Towers and One Crew Facility Block
- 1997-2000
- LEIGHTON-KUMAGAI JVAqueducts Between Tai Po
and Butterfly Valley - SITE FORMATION
Shing Mun Shaft Construction work including installation of sheet piling work
Excavation to Adit Tunnel and Tunnel Works Between
Tai Po Tau and Butterfly Valley including pipe piling work
- 1997-1999
- CHINA ROAD & BRIDGES CO.West Kowloon Reclamation
- ROAD & DRAINAGE
Construction of Bridge and Associated Works
- 1997-1998
- HIP HING-KUMAGAI JVKowloon Station Development
- BUILDING
Construction of Station Structured
- 1997-1997
- ROLLING DEVELOPMENT LTD.Building Renovation Works
at Woo Sung Street Kowloon - BUILDING
Conversion Works of an Office Building to a Hotel
- 1996-1998
- WATER SUPLIERS DEPT. HKSARTseung Kwan O Stage III
Water Supplies Works - ROAD & DRAINAGE
Water Supply Works of Laying 900 dia and 450 dia Water Mains and Minis Pipes
- 1996-1997
- KUMAGAI GUMIMTRC Wanchai Station Extension
- BUILDING
Station Extension Works
- 1996-1996
- KEC JVKowloon Station Development
Lantau-Airport Railway - ROAD & DRAINAGE
Superstructure Works of Lantau-Airport Railway Station
- 1995-1996
- BCJ JVNew Airport Development
Lantau Island
at Chek Lap Kok - ROAD & DRAINAGE
Superstructure and External Works of North and
South Concourses of Passenger Terminal Building
- 1994-1995
- KUMAGAI-MAEDA-CRABC JVWest Kowloon Express Highway
- ROAD & DRAINAGE
Viaduct Structure Works of Highway
- 1992-1993
- NISHIATSU-GAMMON JVContainer Port Terminal No.8
- ROAD & DRAINAGE
Site Formation and Road & Drainage
- 1989-1990
- FU HING CONSTRUCTION CO.399-401 Queen’s Road
Commercial Building - BUILDING
Construction of Superstructure of 23-storey Commercial Building
- 1988-1990
- PILECONRedhill Luxury Residential
Development Site D - BUILDING
Construction of 155 nos. 4-storey Deluxe Houses
- 1988-1989
- PILECONTuen Mun Private Development
TMTL292 - SITE FORMATION
Foundation Works for 4 Residential Towers
- 1988-1989
- PILECONRedhill Luxury
Residential Development Site Formation and Foundation Works for 42 nos. of Deluxe House
- 1987-1989
- AOKIHIGHWAY DEPARTMENT
Tsuen Wan Route 5 Highway - ROAD & DRAINAGE
Construction of Retaining Walls, 4 nos. of Footbridges, Footpaths & Utilities, Reinstatement Works