ROAD & DRAINAGE
- 2018-2019
- MTR CORPORATION LIMITEDExpress Rail Link Contract 8209
Design and construction of Nam Cheong Park Reinstatement
- 2015-2015
- KAU SAI CHAU PUBLIC GOLF COURSEKau Sai Chau
Sai Kung Replacement of Storm Water Drainage Pipe
- 2014-Current
- DRAGAGES-BOUYGUES JVMTR Corporation Ltd. SCL1128
South Ventilation Building to Admiralty Tunnels Temporary Road Construction at Lung King Street (Works Area W14)
Excavation Works for Expose Existing Underground Utilties at Works Area W8
Supply and Installation of Steel Pipe to the Outlet of Seawall at Works Area W1
- 2014-Current
- DRAGAGES HONG KONG LTD.Civil Eng. and Development Department CV/2012/08
Liantang / Heung Yuen Wai Boundary Control Point
Site Formation and Infrastructure Works - Contract 2 Roadworks and Drainage Works at North Portal
- 2014-2018
- DRAGAGES-BOUYGUES JVHighways Department HY/2012/08
Tuen Mun Chek Lap Kok Link-Northern Connection Sub-Sea Tunnel Section Supply of Used Steel Ramp, Modification, Delivery and Installation of Used Steel Ramp for Barging Point
- 2014-2017
- OPERATION DAWN LIMITEDDawn Island
Sai Kung Substructure work, superstructure work, plumbing and drainage works
- 2013-2018
- VINCI CONSTRUCTION GRANDS PROJETSMTR Corporation Ltd. SCL1103
Hin Keng to Diamond Hill Tunnels Concreting Package at Diamond Hill Site
Construction of TBM Unloading Bay and storage area at Kai Tak
Road Widening in Hin Keng Site
- 2013-2014
- THE HONG KONG JOCKEY CLUBSai Kung Resort House
Slope Undating work at Sai Kung Resort House
- 2011-2018
- LAING O'ROURKE-HSIN CHONG-PAUL Y JVMTR Corporation Ltd. XRL810B
West Kowloon Terminus Station U-Channel, Concrete Pavement and Fencing Works
Construction of new road
- 2010-2016
- DRAGAGES-BOUYGUES JVMTR Corporation Ltd. XRL820
Mei Lai Road to Hoi Ting Road Tunnels Construction of Slurry Trench for Slurry Pipe
Construction of Stacker Retaining Wall & Footing, Stacker Dewatering Pit and Rotating Stacker
Water Pipe trench at Barging Point
Construction of Cut & Cover Tunnels at Hoi Ting Road Retrieval Shaft
- 2010-2015
- DRAGAGES-BOUYGUES JVMTR Corporation Ltd. XRL821
Shek Yam to Mei Lai Road Tunnels External Works for VB6 at Kwai Chung Site Area
Construction of CLP Cover
- 2010-2011
- BACHY SOLETANCHE GROUP LTD.MTR Corporation Ltd. XRL803A
West Kowloon Terminus Diaphgram Walls (Site A) Road & Drainage Works
- 2008-2013
- DRAGAGES-NISHIMATSU JVDrainage Services Department DC/2007/10
Design and Construction of Hong Kong West Drainage Tunnel Installation of 610 dia. Marine pipe pile and reclamation work
Cable Trench Path at Site Entrance
- 2004-2005
- WATER SUPPLIES DEPT. HKSARContract No. 3/WSD/03
Tin Hau Temple Road, North Point, H.K. Reprovisioning of North Point Salt Water Service
Reservoir and Relocation of North Point
Upper Salt Water Pump Station
- 2004-2005
- WATER SUPPLIES DEPT. HKSARContract No. 17/WSD/02
Village Mains in North District
Tai Po Stage 1, Phase 1 Replacement and Rehabilitation of Water Mains
- 2004-2004
- EMSDCE/2003(TT)
Replacement of Traffic Control and surveillance System (TCSS)
Replacement of Traffic Control
and Surveillance System (TCSS) Cable and Ductworks Investigation
- 2003-2007
- BALFOUR-BEATTY LAM JVKRCR Contract No. LCC 300
Lok Ma Chau Terminus Construction of 3 km road and drainage work from
Castle Peak Road to Lok Ma Chau Terminal
- 2002-2004
- DRAINAGE SERVICES DEPT. HKSARWSD 17/WSD/01
Remedial Works to Chai Wan Reservoir Remedial Works to Existing Reservoir include
Re-Waterproofing & RC Inner Tanking
- 2002-2003
- DRAINAGE SERVICES DEPT. HKSARWSD 13/WSD/01
Ngau Tam Mei Treatment Works :
Mainlaying Along Castle Peak Road Mainlaying of 350m 1000mm dia Steel Water Main
- 2002-2003
- BALFOUR BEATTY GROUP LTD.CLKAA C312
Airport Extension at East Hall Construction of Substructure and Superstructure
Works including Road and Drainage Works
- 2002-2002
- CHINA STATE CONSTRUCTION ENG. CO.CEDD CV/2000/09
Infrastructures at Penny’s Bay Construction of Box Culvert (Start-up Package)
- 2001-2003
- DRAINAGE SERVICES DEPT. HKSARDSD DC/2000/05
Construction of Sewers at Tong Yan
San Tsuen, Yuen Long Construction of Drainage System
- 2001-2002
- AGRICULTURE, FISHERIES & CONSERVATION DEPT. HKSARR3/01-02
Construction of Footpath
- 2000-2002
- HKC-AMEC JVTDD TM/87/98 Wong Chu Road &
Interchanges Construction Earthwork RC Structures Road Improvement
Noise Mitigation and Drainage Works
- 2000-2001
- HAM-HKC JVCEDD CV/99/12
Penny’s Bay Reclamation Stage I Road and Drainage Slope Stabilization and Reinforced
Earth Structure Works
- 1999-2003
- HKC-AMEC JV, KCRCKCRC CC212 & 213
Siu Hong & Tuen Mun Stations
West Rails Development Site Establishment Works Nullah Cofferdam
RC Substructures Box Tunnel
Retaining Wall and Footbridge Construction
- 1999-2002
- HONG KONG CONSTRUCTIONHYD HY/98/02
Tolo Highway Widening Roadwork, Retaining Walls, North Access Bridge,
Pak Shek Bridge Exten, Tai Po Kau Bridge Exten,
Tai Po Kau Underpass Exten
- 1999-2000
- HYUNDAI E&C, SINO PROPERTIESOlympic Station Development
Site B Phase I & III Construction of 4 50-storey High-rise Residential
Towers on Residential Towers on a 4-storey Podium
and External Works and Road Works
- 1997-1999
- CHINA ROAD & BRIDGES CO.West Kowloon Reclamation
Construction of Bridge and Associated Works
- 1996-1998
- WATER SUPLIERS DEPT. HKSARTseung Kwan O Stage III
Water Supplies Works Water Supply Works of Laying 900 dia and 450 dia Water Mains and Minis Pipes
- 1996-1996
- KEC JVKowloon Station Development
Lantau-Airport Railway Superstructure Works of Lantau-Airport Railway Station
- 1995-1996
- BCJ JVNew Airport Development
Lantau Island
at Chek Lap Kok Superstructure and External Works of North and
South Concourses of Passenger Terminal Building
- 1994-1995
- KUMAGAI-MAEDA-CRABC JVWest Kowloon Express Highway
Viaduct Structure Works of Highway
- 1992-1993
- NISHIATSU-GAMMON JVContainer Port Terminal No.8
Site Formation and Road & Drainage
- 1987-1989
- AOKIHIGHWAY DEPARTMENT
Tsuen Wan Route 5 Highway Construction of Retaining Walls, 4 nos. of Footbridges, Footpaths & Utilities, Reinstatement Works