SITE FORMATION

MAJOR CIVIL ENGINEERING PROJECTS IN HONG KONG
Loading...
  • 2018-Current
  • BACHY SOLETANCHE GROUP LTD.
    Hong Kong International Airport 3503 - Terminal 2
    Foundation and Substructure Works
    • Construction of Concrete Slab
      Diaphragm Wall and Guide Wall Construction
      Soil Disposal

  • 2018-2019
  • MTR CORPORATION LIMITED
    Express Rail Link Contract 8209
    • Design and construction of Nam Cheong Park Reinstatement

  • 2016-2018
  • VINCI CONSTRUCTION GRANDS PROJETS
    MTR Corporation Ltd. SCL1122
    Admiralty South Overrun Tunnel
    • Mucking Out Subcontract

  • 2016-2018
  • MTR CORPORATION LIMITED
    MTR Corporation Ltd. XRL8217
    Shek Yam
    • Backfilling of Shek Yam Construction Adit
      Reinstatement Work
      Reinstate the existing stone wall
      Hydroseeding work

  • 2014-Current
  • DRAGAGES-BOUYGUES JV
    MTR Corporation Ltd. SCL1128
    South Ventilation Building to Admiralty Tunnels
    • Excavation and Lateral Support for W1 Advanced Shaft
      Construction of Concrete Slab and Reinstatement Works at Wan Chai Sports Ground
      Noise Cover and Enclosure at Works Area W1 Advanced Shaft
      Excavation of FPP Peanut Shaft at Works Area W8
      Disposal of Spoil Excavated from TBM Tunnels
      Excavation of SOV Shaft at Works Area W2
      Demolition of Perimeter Wall at Works Area W14
      Earthwork and R.C. Works at FPP Area 2 Shaft at Works Area W8
      Demolition of Slurry Treatment Plant (Reinforced Concrete Structure)
      Disposal of Precast Concrete Segments from Works area W21 to Tuen Mun River Trade Terminal
      Disposal of the Demolished Temporary Concrete Structures in East Tunnels at Works Area W1/W2
      Removal of Concrete Slab for POC’s Pre-Bored H-Piles Construction at Works Area W2
      Construction of Fenwick Pier Emergency Egress Point and Cut & Cover Tunnel at Works Area W8
      Demolition of Slurry Treatment Plant (Reinforced Concrete Structure) Works Area W14

  • 2014-Current
  • DRAGAGES HONG KONG LTD.
    Civil Eng. and Development Department CV/2012/08
    Liantang / Heung Yuen Wai Boundary Control Point
    Site Formation and Infrastructure Works - Contract 2
    • Earthwork at North Portal
      Site Formation, Slope and Drainage Works at Mid Ventilation Adit Portal
      Platform Formation for Bridge Construction at South Portal
      Sedimentation Tank at Mid Ventilation Portal
      Disposal of Excavated Material from Adit at Mid Ventilation Portal
      Site Formation, Slope and Drainage Works at South Portal
      ELS at Spoil Basin at North Portal
      Disposal of Excavated Material from Tunnels at North Portal
      Disposal of Excavation Materials from Drill and Blast Tunnel at South Portal
      Earthwork for Administration Building
      Additional Works for Spoil Basin ELS
      Earthwork for Administration Building Foundation
      Shotcreting works for TBM Tunnels
      Material Handling for TBM Tunnels
      Permanent Soil Nailing Works at North Portal

  • 2013-2018
  • VINCI CONSTRUCTION GRANDS PROJETS
    MTR Corporation Ltd. SCL1103
    Hin Keng to Diamond Hill Tunnels
    • Construction for MCV Temporary Platform
      Construction for FTA Temporary Platform
      Mucking Outs Works
      Excavation at Mucking Out at Portal at Hin Keng
      Hin Keng Box 2 Excavation
      Shaft Excavation at Diamond Hill Site
      To supply and install Cut-off Wall Capping Beam at Diamond Hill Station
      DIH Capping Beam Remaining D-wall Panels
      Construction of Base Slab at Diamond Hill Station
      Rock Filling and Concrete Slab at Shui Chuen O
      Shaft & Central Accomodation Excavation & ELS Works at Ma Chai Hang
      Excavation of Cut and Cover Tunnel Area 3 at Hin Keng
      Site Clearance of TKO Magazine
      Concrete Structure Breaking and Excavation for DIH Site Area
      Demolition and Removal of 3rd Filter Structure at DIH site
      Reinstatement Works at Hin Keng and W5B

  • 2012-2015
  • NISHIMATSU CONSTRUCTION CO., LTD.
    MTR Corporation Ltd. SIL902
    Nam Fung Tunnel and Ventilation Buildings
    • Land & Marine Disposal and Barging Point Operation

  • 2012-2014
  • LEIGHTON-GAMMON JV
    MTR Corporation Ltd. XRL810A
    West Kowloon Terminus Station North
    • Sorting and Disposal of Excavated Rock Material to XRL821

  • 2012-2013
  • LEIGHTON CONTRACTORS (ASIA) LTD.
    MTR Corporation Ltd. XRL822
    Tse Uk Tsuen to Shek Yam Tunnels
    • Tunnel Spoil Disposal

  • 2012-2013
  • BACHY SOLETANCHE GROUP LTD.
    CB204
    Proposed Goldin Financial Global Centre at NKIL 6314 Kln.
    • Spoil Removal for Diaphragm Wall, Bored Piles and Socketed H-Piles

  • 2011-2018
  • LAING O'ROURKE-HSIN CHONG-PAUL Y JV
    MTR Corporation Ltd. XRL810B
    West Kowloon Terminus Station
    • Basement Ventilation for top down construction
      Supply and Installation of General Fill and Sub-base Material to Ground Floor Slab
      Barging Point Reinstatement Works

  • 2011-2011
  • BACHY SOLETANCHE GROUP LTD.
    Drainage Services Department DC/2007/24
    Harbour Treatment Scheme
    • Shear pins construction at Sai Ying Pun

  • 2010-2016
  • DRAGAGES-BOUYGUES JV
    MTR Corporation Ltd. XRL820
    Mei Lai Road to Hoi Ting Road Tunnels
    • Construction of Sheet Piling Wall for DSD Rising Main Diversion
      Construction of Socketed H-Pile
      Foundation for DSD Rising Main Diversion
      Construction of Temporary Fill Platform at Nam Cheong Launching Shaft
      Site Establishment Works at Nam Cheong Barging Point
      Construction of Concrete Slab inside Slurry Treatment Tanks
      Construction of Slurry Tank Foundation Slab
      Construction of Filter Press Slab for Slurry treatment plant
      Additional Works for Backfilling of Retrieval Shaft 811A
      Dismantling & Removal of Container Surrounding Site 6 Stockpile
      Miscellaneous Works for Rockfill Layer at Nam Cheong Launching Shaft

  • 2010-2015
  • DRAGAGES-BOUYGUES JV
    MTR Corporation Ltd. XRL821
    Shek Yam to Mei Lai Road Tunnels
    • Land Transportation of De-sanding Materials
      Earthwork, Concrete Work and Miscellaneous
      Breaking out of Concrete Invert Slab inside Tunnel Work for VB6
      Closure of openings in 821 Twin Track Tunnel
      Remedial works inside the Tunnels due to setting out errors
      Backfilling to North & South Adit Bypasses

  • 2010-2013
  • BACHY SOLETANCHE-LAING O'ROURKE JV
    MTR Corporation Ltd. XRL811A
    West Kowloon Terminus Approach Tunnel
    • Site Clearance and Construction of Temporary Carriageway and
      Spoil Disposal for Piled Foundations Excavation & Lateral Support (ELS)

  • 2010-2011
  • BACHY SOLETANCHE GROUP LTD.
    MTR Corporation Ltd. XRL825
    Mai Po to Ngau Tam Mei Tunnels
    • Spoil Removal, Guide Walls

  • 2009-2010
  • BACHY SOLETANCHE GROUP LTD.
    Proposed Development at TPTL No.188 Pak Shek Kok, Tai Po
    • Guide Wall and Spoil disposal

  • 2008-2013
  • DRAGAGES-NISHIMATSU JV
    Drainage Services Department DC/2007/10
    Design and Construction of Hong Kong West Drainage Tunnel
    • Earthworks and Reinforced Concrete Works of Spoil Bsin at Western Portal
      Excavated Materials Off Site from Western Portal
      Supply of Pea Gravel to Western Portal
      Site Set Up, Temporary Drainage Works, Shaft Intake & Slope works at Intake TP4, TP5, TP789
      Temporary excavation and lateral supporting for deep structures
      Removal of Pipe Pipes

  • 2008-2009
  • BACHY SOLETANCHE GROUP LTD.
    Contract for Foundation Works
    Cathay Pacific Air Cargo
    • Shoring installation
      Spoil removal, pile head trimming & sheet pile

  • 2005-2006
  • BACHY SOLETANCHE GROUP LTD.
    Contract No. C407D
    Tung Chung Station Development
    Package 2, Phase 4 Lowrise Development
    • Removal of Spoil & Construction of Guide Wall
      Installation of sheet piling work
      Construction of foundation work.

  • 2004-2005
  • BACHY SOLETANCHE GROUP LTD.
    Contract P352
    Skyplaza Advance Works
    • Construction of Guide Wall and Removal of Rock Fill

  • 2003-2006
  • VSL HONG KONG LTD.
    Contract No. HY/99/19
    Castle Peak Road
    • Castle Peak Road Improvement
      Construction of Reinforced Earth Wall

  • 2003-2004
  • BACHY SOLETANCHE GROUP LTD.
    Contract CA211
    Shek Lei Estate Phase 10
    • Foundation Works for Block No.11 & 12 and Car Park
      for Redevelopment of Shek Lei Estate Phase 10

  • 2002-2004
  • CHINA STATE CONSTRUCTION
    CED CV/2001/10 Contract 2 for
    Infrastructures at Penny’s Bay Development
    • Earthwork (Slope & Ground Treatment)

  • 1998-1999
  • KUMAGAI GUMI
    Discovery Bay North Development
    • Tunnel Excavation Works and pipe piling work

  • 1997-2000
  • LEIGHTON-KUMAGAI JV
    Aqueducts Between Tai Po
    and Butterfly Valley
    • Shing Mun Shaft Construction work including installation of sheet piling work
      Excavation to Adit Tunnel and Tunnel Works Between
      Tai Po Tau and Butterfly Valley including pipe piling work

  • 1988-1989
  • PILECON
    Tuen Mun Private Development
    TMTL292
    • Foundation Works for 4 Residential Towers